Washington Monument Renovation


వాషింగ్టన్ డిసి

Washington Monument Elevator Project

Washington Monument Renovation

ప్రాజెక్ట్ PDFని డౌన్‌లోడ్ చేయండి

ఈ ప్రాజెక్ట్ గురించి మరింత తెలుసుకోవాలనుకుంటున్నారా?

మనం మాట్లాడుకుందాం

ఈ ప్రాజెక్ట్ గురించి

On August 23, 2011, a 5.9 magnitude earthquake hit the DC metropolitan area and caused considerable damage to the monument. It was closed and after $15 million in repair work, it was reopened only to be closed again in 2016 after an elevator cable snapped. Lerch Bates was called upon to use our expertise to replace the outdated elevator. Teaming with Delaware Elevator, we wrote specifications for the new elevator along with a new programmed operating system for the elevator. It enables the elevator to be used without an attendant and also slows as the elevator descends to show the “state stones” in the inside of the monument.
పరిశోధించండిమరమ్మతు + ఆధునికీకరించండినిలువు రవాణాప్రభుత్వంచారిత్రాత్మకమైనది

ఒక చూపులో

క్లయింట్

National Park Service | Jacobs Engineering

ప్రాజెక్ట్ పరిమాణం

55 square ft (base) 554 ft high

తేదీ పూర్తయింది

09-2019